The President and Fellows of Harvard University (Cambridge Allston Blackstone)
Cambridge, Middlesex County, Massachusetts · owned by President & Fellows of Harvard College
Generating units retired 20032023 · headline year
Retired — its last generating unit went out of service in 2003, ending 12.5 MW of capacity.
Fuel spend$19.3M2023 · estimate
Retired capacity12.5MW1 unit · none in service
CO₂ emitted79,476t2023 · reported to EPA · 2,797th highest of 6,030 in the US
Rank in Massachusetts#22of 59 · by reported CO₂ · #2,797 of 6,030 US
Reported suppliersNot reported2023
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
1 of 1 shown · none in service
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Who supplies the fuel
2023
No fuel deliveries are reported for 2023.
In the Atlas
- Spend and volume trend15 years
- Unit-level fuel and emissions15 unit-fuel records for 2023
Open in the Atlas →
Ownership & operations
- Industry sector
- Other
- EPA facility ID
- 1000656
Common questions
How big is The President and Fellows of Harvard University (Cambridge Allston Blackstone)?
12.5 MW across 1 unit, none of which is in service — all retired.
Who owns and operates it?
When is it due to retire?
It has already retired — the last unit retired in 2003.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by residual oil.
How much does it spend on fuel?
An estimated $19.3M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
79,476 t in 2023, reported to the EPA — the 2,797th highest of 6,030 US facilities that reported. Up from 74,824 t in 2011.