Lincoln, Lancaster County, Nebraska · SPP · operated by Lincoln Electric System · owned by Lincoln Electric System
2023 · headline year
Reported fuel cost$2.2M2023 · reported deliveries
Capacity in service216MW8 units · gas + biomass + oil
Net generation89.1GWh2023 · reported
CO₂ emitted37,289t2023 · reported to EPA · 4,298th highest of 6,030 in the US
Rank in Nebraska#18of 127 · by capacity · #1,328 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2023
Capacity factor5%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
69% Natural gas · 653,838 MMBtu · reported31% Landfill gas · 287,645 MMBtu · reported
Natural gas supplies 69% of the fuel energy it burned in 2023.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
10 of 10 shown · 216 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 2
60.5
Natural Gas
Natural Gas Fired Combined Cycle
2003
Operating
Unit 3
60.5
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
Unit 4
60.5
Natural Gas
Natural Gas Fired Combustion Turbine
2003
Operating
Unit 1
28.2
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
Unit BSU
1.8
Distillate oil
Petroleum Liquids
2004
Operating
Unit LFG1
1.6
Landfill gas
Landfill Gas
2014
Operating
Unit LFG2
1.6
Landfill gas
Landfill Gas
2014
Operating
Unit LFG3
1.6
Landfill gas
Landfill Gas
2014
Operating
Unit 5
52.0
Natural Gas
Natural Gas Fired Combustion Turbine
2029
Planned
Unit 6
52.0
Natural Gas
Natural Gas Fired Combustion Turbine
2029
Planned
All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
216 MW across 8 generating units in service — 210 MW of natural gas, 4.8 MW of biomass and 1.8 MW of oil. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Lincoln Electric System (100%) and operated by Lincoln Electric System, filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2004. The oldest operating units are Unit 2 and Unit 4 (2003); the newest are Unit LFG1, Unit LFG2 and Unit LFG3 (2014).
When is it due to retire?
No retirement date has been filed for any operating unit at Terry Bundy Generating Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and landfill gas.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $2.2M in 2023.
How much CO₂ does it emit?
37,289 t in 2023, reported to the EPA — the 4,298th highest of 6,030 US facilities that reported. Down from 43,657 t in 2011.