Shiro, Grimes County, Texas · ERCOT · operated by Tenaska Frontier Partners Ltd · owned by Tenaska Frontier Partners LTD
2023 · headline year
Fuel spend$82.8M2023 · estimate
Capacity in service940MW4 units · gas
Net generation4.17TWh2023 · reported
CO₂ emitted1.66Mt2023 · reported to EPA · 366th highest of 6,030 in the US
Rank in Texas#36of 941 · by capacity · #331 of 13,147 US
Reported suppliers22023 · 24 deliveries
Capacity factor51%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 30.7 TBtu · reported · $82.8M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 940 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit STG1
390.1
Natural Gas
Natural Gas Fired Combined Cycle
2000
Operating
Unit GTG1
183.2
Natural Gas
Natural Gas Fired Combined Cycle
2000
Operating
Unit GTG2
183.2
Natural Gas
Natural Gas Fired Combined Cycle
2000
Operating
Unit GTG3
183.2
Natural Gas
Natural Gas Fired Combined Cycle
2000
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 267 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Diamond Frontier LLC <1% of 4 units Montana Grimes County LLC <1% of 4 units Montana Grimes Frontier LP 25% of 4 units Tanaska Grimes Partners LP 74% of 4 units Tenaska VI Partners LP <1% of 4 units
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1001303
Balancing authority
ERCOT
NERC region
SERC
Gas pipeline
Kinder Morgan Tejas Pipeline LLC
EIA plant ID
55062
Common questions
How big is Tenaska Frontier Generation Station?
940 MW across 4 generating units in service.
Who owns and operates it?
Owned by Tenaska Frontier Partners LTD and operated by Tenaska Frontier Partners Ltd, filed as independent power producer. 5 owner stakes are filed on jointly held units.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2000. Every operating unit came online in 2000.
When is it due to retire?
No retirement date has been filed for any operating unit at Tenaska Frontier Generation Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 2 suppliers in 2023.
How much does it spend on fuel?
An estimated $82.8M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.66 Mt in 2023, reported to the EPA — the 366th highest of 6,030 US facilities that reported. Up from 1.6 Mt in 2011.