AMERICAN ENERGY ATLAS
Power·Nebraska

Tecumseh

Johnson County, Nebraska · SPP · operated by City of Tecumseh

2023 · headline year
Fuel spend$13,7832023 · estimate
Capacity in service7.0MW5 units · gas + oil
Rank in Nebraska#67of 127 · by capacity · #6,147 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Johnson County · SPP · MRO

What it burns

2023 · reported

Share of reported fuel consumption

51% Natural gas · 567 MMBtu · reported · $1,959 est.49% Oil & petroleum · 553 MMBtu · reported · $11,824 est.

Natural gas supplies 51% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs Tecumseh an estimated 6.2× more than natural gas.

Reported fuel consumption, MMBtu · 2011–2023

02,0004,0006,000201120172023
Reported (through 2023)

Generating units

7 of 7 shown · 7.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 5A2.4Natural GasNatural Gas Internal Combustion Engine1993Operating
Unit 21.5Natural GasNatural Gas Internal Combustion Engine1968Operating
Unit 41.3Distillate oilPetroleum Liquids1960Operating
Unit 31.1Distillate oilPetroleum Liquids1953Operating
Unit 10.7Distillate oilPetroleum Liquids1948Operating
Unit 62.1Distillate oilPetroleum Liquids2027Planned
Unit 72.1Distillate oilPetroleum Liquids2027Planned

All 7 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →
UnitEventWhenMW
Unit 6new unit20272.1 MW
Unit 7new unit20272.1 MW

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Tecumseh
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
SPP
NERC region
MRO
Gas pipeline
Black Hills Energy
EIA plant ID
2308

Common questions

How big is Tecumseh?
7.0 MW across 5 generating units in service — 3.9 MW of natural gas and 3.1 MW of oil. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Tecumseh, filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1971. The oldest operating unit is Unit 1 (1948); the newest is Unit 5A (1993).
When is it due to retire?
No retirement date has been filed for any operating unit at Tecumseh. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $13,783 in 2023 — natural gas $1,959 and oil & petroleum $11,824. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Nebraska energyAll facilities in the state→Archer Daniels Midland Company7.9 MW operating capacity→ Western Sugar Company7.1 MW operating capacity→ Creston Ridge II, LLC6.9 MW operating capacity→ Perennial Windfarm6.9 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming