TAC-Distributed Energy Resource Hybrid

Champaign County, Illinois · MISO · operated by Ameren Illinois

2023 · headline year
Capacity in service0.5MW3 units · storage + solar + wind · 1 more on standby or out of service
Rank in Illinois#433of 433 · by capacity · #13,139 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Champaign County · MISO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 34 MMBtu · reported

Reported fuel consumption, MMBtu · 2018–23

0300600900201820202023
Reported (through 2023)

Generating units

4 of 4 shown · 0.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit NG1.0Natural GasNatural Gas Internal Combustion Engine2017Standby
Unit BA0.3StorageBatteries2017Operating
Unit SOLAR0.1SolarSolar Photovoltaic2017Operating
Unit WIND0.1WindOnshore Wind Turbine2017Operating

All 4 units shown. Behind each one, AEA holds the full engineering record: turbine manufacturer, turbine count and hub height; panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Ameren Illinois
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
SERC
EIA plant ID
61990

Common questions

How big is TAC-Distributed Energy Resource Hybrid?
0.5 MW across 3 generating units in service — 0.3 MW of storage, 0.1 MW of solar and 0.1 MW of wind. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Ameren Illinois, filed as investor-owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2017. Every operating unit came online in 2017.
When is it due to retire?
No retirement date has been filed for any operating unit at TAC-Distributed Energy Resource Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.

Related pages

Illinois energyAll facilities in the state→USS Man Solar LLC1.0 MW operating capacity→ GE-Hitachi Solar - Morris, IL0.9 MW operating capacity→ WRB Refining LP Wood River Refinery4.2 Mt CO₂ in 2023→ Lemont Refinery1.86 Mt CO₂ in 2023→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming