AMERICAN ENERGY ATLAS
Power·New York

Syracuse, LLC

Solvay, Onondaga County, New York · NYISO · operated by Lakeside Syracuse LLC

last reported to the EPA in 2014

2023 · headline year
Capacity in service103MW2 units · gas
Net generation10.8GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2014
Rank in New York#58of 1,018 · by capacity · #2,320 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor1%2023

Location

Onondaga County · NYISO · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 99,234 MMBtu · reported

CO₂ emitted, t · 2011–14

010,00020,00030,000201120122014
Reported (through 2014)

Generating units

2 of 2 shown · 103 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN165.5Natural GasNatural Gas Fired Combined Cycle1994Operating
Unit GEN237.2Natural GasNatural Gas Fired Combined Cycle1994Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 4 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Lakeside Syracuse LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1001219
Balancing authority
NYISO
NERC region
NPCC
EIA plant ID
10621

Common questions

How big is Syracuse, LLC?
103 MW across 2 generating units in service.
Who owns and operates it?
Operated by Lakeside Syracuse LLC, filed as independent power producer.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1994. Every operating unit came online in 1994.
When is it due to retire?
No retirement date has been filed for any operating unit at Syracuse, LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.

Related pages

New York energyAll facilities in the state→Glenwood Landing Energy Center106 MW operating capacity→ Number Three Wind Project106 MW operating capacity→ Massena Energy Facility102 MW operating capacity→ Eight Point Wind101 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming