Juneau, Alaska · operated by Juneau Hydropower, Inc
Capacity shown is planned or not in service
A planned 19.8 MW conventional hydroelectric project, filed to come online in 2028.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit JHI01 | 6.6 | Water | Conventional Hydroelectric | 2028 | Proposed |
| Unit JHI02 | 6.6 | Water | Conventional Hydroelectric | 2028 | Proposed |
| Unit JHI03 | 6.6 | Water | Conventional Hydroelectric | 2028 | Proposed |
All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit JHI01 | new unit | 2028 | 6.6 MW |
| Unit JHI02 | new unit | 2028 | 6.6 MW |
| Unit JHI03 | new unit | 2028 | 6.6 MW |