Hamilton County, Florida · FPC · operated by White Springs Agrici Chem Inc
Retired 2014
Retired — its last generating unit went out of service in 2014, ending 27.3 MW of capacity.
Retired capacity27.3MW1 unit · none in service
Reported suppliersNot reported2023
Location
Reported fuel consumption, MMBtu · 2013–14
Reported (through 2014)
Generating units
1 of 1 shown · none in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit SRC
27.3
Other
All Other
1986
Retired 2014
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.