Fuel spend$02023 · no purchased fuel
Capacity in service7.8MW4 units · storage + solar
Rank in California#800of 1,713 · by capacity · #5,996 (tied) of 13,147 US
All 4 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.
See the engineering record →
How big is SunAnza?
7.8 MW across 4 generating units in service — 4.4 MW of storage and 3.4 MW of solar.
Who owns and operates it?
Operated by Arizona Electric Pwr Coop Inc, filed as cooperative.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2021. The oldest operating unit is Unit ANZA1 (2017); the newest is Unit BA3 (2023).
When is it due to retire?
No retirement date has been filed for any operating unit at SunAnza. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Batteries (4.4 MW) and Solar Photovoltaic (3.4 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.