Creston, Union County, Iowa · MISO · operated by Central Iowa Power Cooperative · owned by Central Iowa Power Cooperative
2023 · headline year
Fuel spend$1.96M2023 · estimate
Capacity in service119MW5 units · gas
Net generation72.1GWh2023 · reported
CO₂ emitted36,040t2023 · reported to EPA · 4,361st highest of 6,030 in the US
Rank in Iowa#70of 256 · by capacity · #2,153 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor7%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 672,671 MMBtu · reported · $1.96M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
12 of 12 shown · 119 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GT2
35.3
Natural Gas
Natural Gas Fired Combustion Turbine
1975
Operating
Unit GT1
27.0
Natural Gas
Natural Gas Fired Combustion Turbine
1973
Operating
Unit R1
18.8
Natural Gas
Natural Gas Internal Combustion Engine
2021
Operating
Unit R2
18.8
Natural Gas
Natural Gas Internal Combustion Engine
2021
Operating
Unit R3
18.8
Natural Gas
Natural Gas Internal Combustion Engine
2021
Operating
Unit 1
7.5
Natural Gas
Natural Gas Fired Combined Cycle
1951
Retired 2021
Unit 2
7.5
Natural Gas
Natural Gas Fired Combined Cycle
1951
Retired 2021
Unit 3
7.5
Natural Gas
Natural Gas Fired Combined Cycle
1957
Retired 2021
Unit IC1
1.0
Distillate oil
Petroleum Liquids
1948
Retired 2007
Unit IC2
1.0
Distillate oil
Petroleum Liquids
1948
Retired 2007
Unit IC4
1.0
Distillate oil
Petroleum Liquids
1948
Retired 2007
Unit IC5
1.0
Distillate oil
Petroleum Liquids
1948
Retired 2007
All 12 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1996. The oldest operating unit is Unit GT1 (1973); the newest are Unit R1, Unit R2 and Unit R3 (2021).
When is it due to retire?
No retirement date has been filed for any operating unit at Summit Lake. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.96M in 2023 — natural gas $1.96M and oil & petroleum $748. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
36,040 t in 2023, reported to the EPA — the 4,361st highest of 6,030 US facilities that reported. Up from 13,410 t in 2011.