Summer Falls Power Plant

Grant County, Washington · AVA · operated by Columbia Basin Hydropower

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service92.0MW2 units · hydro
Rank in Washington#57of 128 · by capacity · #2,587 (tied) of 13,147 US

Location

Grant County · AVA · WECC

Generating units

2 of 2 shown · 92.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 146.0WaterConventional Hydroelectric1985Operating
Unit 246.0WaterConventional Hydroelectric1985Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Ownership & operations

Operating utility
Columbia Basin Hydropower
Jointly held units
East Columbia Basin Irr Dist 33% of 2 units
Quincy-Columbia Basin Irr Dist 33% of 2 units
South Columbia Basin Irr Dist 33% of 2 units
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
AVA
NERC region
WECC
EIA plant ID
56695

Common questions

How big is Summer Falls Power Plant?
92.0 MW across 2 generating units in service.
Who owns and operates it?
Operated by Columbia Basin Hydropower, filed as municipally owned utility. 3 owner stakes are filed on jointly held units.
Which grid does it sell into?
AVA (Avista Corporation) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1985. Every operating unit came online in 1985.
When is it due to retire?
No retirement date has been filed for any operating unit at Summer Falls Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Conventional Hydroelectric (92.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (conventional hydroelectric) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Washington energyAll facilities in the state→Harvest Wind Project98.9 MW operating capacity→ Nine Canyon95.9 MW operating capacity→ Box Canyon90.0 MW operating capacity→ Vantage Wind Energy LLC90.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming