Subase Microgrid Project

New London County, Connecticut · ISO-NE · operated by Connecticut Mun Elec Engy Coop

2023 · headline year
Capacity in service7.4MW2 units · gas
Net generation34.2GWh2023 · reported
Rank in Connecticut#54 (tied)of 168 · by capacity · #6,088 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor53%2023

Location

New London County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 241,843 MMBtu · reported

Reported fuel consumption, MMBtu · 2022–23

0100,000200,000300,00020222023
Reported (through 2023)

Generating units

6 of 6 shown · 7.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit SFC13.7Natural GasOther Natural Gas2022Operating
Unit SFC23.7Natural GasOther Natural Gas2022Operating
Unit SMP13.7Natural GasNatural Gas Internal Combustion Enginenot reportedCanceled
Unit SMP23.7Natural GasNatural Gas Internal Combustion Enginenot reportedCanceled
Unit SMP33.7Natural GasNatural Gas Internal Combustion Enginenot reportedCanceled
Unit SMP42.0Natural GasNatural Gas Internal Combustion Enginenot reportedCanceled

All 6 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Connecticut Mun Elec Engy Coop
Entity type
Cooperative
Regulatory status
Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
59701

Common questions

How big is Subase Microgrid Project?
7.4 MW across 2 generating units in service. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Connecticut Mun Elec Engy Coop, filed as cooperative.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2022. Every operating unit came online in 2022.
When is it due to retire?
No retirement date has been filed for any operating unit at Subase Microgrid Project. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.

Related pages

Connecticut energyAll facilities in the state→Rainbow (CT)8.0 MW operating capacity→ Naval Submarine Base New London7.4 MW operating capacity→ Bulls Bridge7.2 MW operating capacity→ Bradley Energy Center5.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming