AMERICAN ENERGY ATLAS
Power·Michigan

Sturgis City Diesel Plant

St Joseph County, Michigan · PJM · operated by City of Sturgis - (MI)

2023 · headline year
Fuel spend$20,5912023 · estimate
Capacity in service6.0MW1 unit · gas
Net generation208MWh2023 · reported
Rank in Michigan#170 (tied)of 258 · by capacity · #6,337 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

St Joseph County · PJM · RFC

What it burns

2023 · reported

Share of reported fuel consumption

70% Natural gas · 1,735 MMBtu · reported · $4,860 est.30% Oil & petroleum · 746 MMBtu · reported · $15,731 est.

Natural gas supplies 70% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs Sturgis City Diesel Plant an estimated 7.5× more than natural gas.

Reported fuel consumption, MMBtu · 2011–2023

03,0006,0009,000201120172023
Reported (through 2023)

Generating units

5 of 5 shown · 6.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 66.0Natural GasNatural Gas Internal Combustion Engine1981Operating
Unit 11.0Distillate oilPetroleum Liquids1947Retired 2008
Unit 21.0Distillate oilPetroleum Liquids1948Retired 2008
Unit 41.0Distillate oilPetroleum Liquids1947Retired 2007
Unit 51.0Distillate oilPetroleum Liquids1947Retired 2007

All 5 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Sturgis - (MI)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
1855

Common questions

How big is Sturgis City Diesel Plant?
6.0 MW across 1 generating unit in service. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Sturgis - (MI), filed as municipally owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1981.
When is it due to retire?
No retirement date has been filed for any operating unit at Sturgis City Diesel Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $20,591 in 2023 — natural gas $4,860 and oil & petroleum $15,731. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Michigan energyAll facilities in the state→Five Channels6.0 MW operating capacity→ Grand Rapids6.0 MW operating capacity→ Fremont Community Digester, LLC5.8 MW operating capacity→ Wyandotte Dept Muni Power5.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming