AMERICAN ENERGY ATLAS
Power·Iowa

Story City

Story County, Iowa · MISO · operated by City of Story City - (IA)

2023 · headline year
Fuel spend$51,7672023 · estimate
Capacity in service13.9MW6 units · oil + gas
Net generation233MWh2023 · reported
Rank in Iowa#138of 256 · by capacity · #5,019 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Story County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

96% Oil & petroleum · 2,406 MMBtu · reported · $51,446 est.4% Natural gas · 110 MMBtu · reported · $321 est.

Oil & petroleum supplies 96% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

05,00010,00015,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 13.9 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 4A3.5Distillate oilPetroleum Liquids2003Operating
Unit 5A3.1Distillate oilPetroleum Liquids1993Operating
Unit 22.0Natural GasNatural Gas Internal Combustion Engine1972Operating
Unit 62.0Distillate oilPetroleum Liquids1978Operating
Unit 72.0Distillate oilPetroleum Liquids1978Operating
Unit 11.3Distillate oilPetroleum Liquids1964Operating

All 6 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Story City - (IA)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
MRO
Gas pipeline
Black Hills Energy
EIA plant ID
1188

Common questions

How big is Story City?
13.9 MW across 6 generating units in service — 11.9 MW of oil and 2.0 MW of natural gas.
Who owns and operates it?
Operated by City of Story City - (IA), filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1985. The oldest operating unit is Unit 1 (1964); the newest is Unit 4A (2003).
When is it due to retire?
No retirement date has been filed for any operating unit at Story City. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum and natural gas.
How much does it spend on fuel?
An estimated $51,767 in 2023 — oil & petroleum $51,446 and natural gas $321. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Iowa energyAll facilities in the state→Estherville15.6 MW operating capacity→ Hardin Hilltop Wind LLC14.7 MW operating capacity→ South Plant (IA)12.0 MW operating capacity→ Metro Methane Recovery Facility11.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming