Stony Brook

Ludlow, Hampden County, Massachusetts · ISO-NE · operated by Massachusetts Mun Wholes Electric Co · owned by Massachusetts Municipal Wholesale Electric Co, Green Mountain Power Corp and Village of Lyndonville Vermont

2023 · headline year
Fuel spend$4.47M2023 · estimate
Capacity in service538MW8 units · oil + solar · 2 more on standby or out of service
Net generation22.1GWh2023 · reported
CO₂ emitted17,081t2023 · reported to EPA · 5,536th highest of 6,030 in the US
Rank in Massachusetts#8of 666 · by capacity · #664 of 13,147 US
Reported suppliers22023 · 4 deliveries
Capacity factor0%2023

Location

Hampden County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

82% Oil & petroleum · 179,777 MMBtu · reported · $3.8M est.18% Natural gas · 39,607 MMBtu · reported · $666,348 est.

Oil & petroleum supplies 82% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs Stony Brook an estimated 1.3× more than natural gas — and oil & petroleum is 7 of its 8 operating units and 99% of operating capacity.

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

12 of 12 shown · 538 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit CA1105.0Distillate oilPetroleum Liquids1981Operating
Unit 185.0Distillate oilPetroleum Liquids1982Operating
Unit 285.0Distillate oilPetroleum Liquids1982Operating
Unit CT185.0Distillate oilPetroleum Liquids1981Operating
Unit CT285.0Distillate oilPetroleum Liquids1981Operating
Unit CT385.0Distillate oilPetroleum Liquids1981Operating
Unit 5051S6.9SolarSolar Photovoltaic2018Operating
Unit BS#12.0Distillate oilPetroleum Liquids2007Standby
Unit BS#22.0Distillate oilPetroleum Liquids2007Standby
Unit EDSI0.6Distillate oilPetroleum Liquids1981Operating
Unit 3A302.0Natural GasNatural Gas Fired Combined Cyclenot reportedCanceled
Unit CT4120.0Distillate oilPetroleum Liquidsnot reportedCanceled

All 12 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; panel technology, tracking and DC capacity; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

1 of 2 suppliers · delivered in 2023
SupplierFuelDelivered MMBtuTonsMine of originTransport
ValeroOil & petroleum521,856n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 383 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 2 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Massachusetts Mun Wholes Electric Co
Jointly held units
Green Mountain Power Corp 9% of 9 units
Massachusetts Mun Wholes Electric Co 91% of 9 units
The Town of Lyndon Electric Department <1% of 9 units
Entity type
Political Subdivision
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001021
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
6081

Common questions

How big is Stony Brook?
538 MW across 8 generating units in service — 531 MW of oil and 6.9 MW of solar. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Massachusetts Municipal Wholesale Electric Co, Green Mountain Power Corp and Village of Lyndonville Vermont and operated by Massachusetts Mun Wholes Electric Co, filed as political subdivision. 3 owner stakes are filed on jointly held units.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1982. The oldest operating units are Unit CA1, Unit CT1, Unit CT2, Unit CT3 and 1 more (1981); the newest is Unit 5051S (2018).
When is it due to retire?
No retirement date has been filed for any operating unit at Stony Brook. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum and natural gas. Natural gas and oil & petroleum came from 2 suppliers in 2023.
How much does it spend on fuel?
An estimated $4.47M in 2023 — oil & petroleum $3.8M and natural gas $666,348. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
17,081 t in 2023, reported to the EPA — the 5,536th highest of 6,030 US facilities that reported. Down from 87,946 t in 2011.

Related pages

Massachusetts energyAll facilities in the state→Bellingham Power Generation LLC578 MW operating capacity→ Blackstone Power Generation LLC578 MW operating capacity→ Millennium Power428 MW operating capacity→ Medway Station399 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming