AMERICAN ENERGY ATLAS
Power·Montana

Stoltze CoGen1

Flathead County, Montana · BPAT · operated by F H Stoltze Land & Lumber Co

2023 · headline year
Capacity in service2.8MW1 unit · biomass
Net generation19.7GWh2023 · reported
Rank in Montana#65of 71 · by capacity · #9,177 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor80%2023

Location

Flathead County · BPAT · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 541,351 MMBtu · reported

Reported fuel consumption, MMBtu · 2013–2023

0200,000400,000600,000201320182023
Reported (through 2023)

Generating units

1 of 1 shown · 2.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit STL22.8WoodWood/Wood Waste Biomass2013Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
F H Stoltze Land & Lumber Co
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
BPAT
NERC region
WECC
EIA plant ID
58523

Common questions

How big is Stoltze CoGen1?
2.8 MW across 1 generating unit in service.
Who owns and operates it?
Operated by F H Stoltze Land & Lumber Co, filed as industrial.
Which grid does it sell into?
BPAT (Bonneville Power Administration) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2013.
When is it due to retire?
No retirement date has been filed for any operating unit at Stoltze CoGen1. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.

Related pages

Montana energyAll facilities in the state→Magpie Solar, LLC3.0 MW operating capacity→ South Mills Solar, LLC3.0 MW operating capacity→ Flint Creek Hydroelectric LLC2.0 MW operating capacity→ GCC Trident Solar Project2.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming