AMERICAN ENERGY ATLAS
Power·California

Still Water Power

Kings County, California · CAISO · operated by Still Water Power LLC

2023 · headline year
Capacity in service1.0MW1 unit · biomass
Net generation634MWh2023 · reported
Rank in California#1,559 (tied)of 1,713 · by capacity · #12,215 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor7%2023

Location

Kings County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 9,428 MMBtu · reported

Reported fuel consumption, MMBtu · 2020–23

020,00040,00060,000202020222023
Reported (through 2023)

Generating units

1 of 1 shown · 1.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 41.0BiogasOther Waste Biomass2020Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Still Water Power LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
64141

Common questions

How big is Still Water Power?
1.0 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Still Water Power LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2020.
When is it due to retire?
No retirement date has been filed for any operating unit at Still Water Power. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Related pages

California energyAll facilities in the state→Springville Hydroelectric1.0 MW operating capacity→ Stage Gulch Solar1.0 MW operating capacity→ Strata Roof 11.0 MW operating capacity→ Summer Solar D21.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming