Fuel spend$60,7432023 · estimate
Capacity in service65.3MW3 units · gas + oil
Net generation2.13GWh2023 · reported
CO₂ emitted984t2023 · reported to EPA · 5,974th highest of 6,030 in the US
Rank in New York#91of 1,018 · by capacity · #3,144 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor0%2023
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is Sterling Power Plant?
65.3 MW across 3 generating units in service — 64.2 MW of natural gas and 1.1 MW of oil.
Who owns and operates it?
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1991. Every operating unit came online in 1991.
When is it due to retire?
No retirement date has been filed for any operating unit at Sterling Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $60,743 in 2023 — natural gas $59,860 and oil & petroleum $882. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
984 t in 2023, reported to the EPA — the 5,974th highest of 6,030 US facilities that reported. Down from 1,967 t in 2011.