AMERICAN ENERGY ATLAS
Power·California

Starbucks - Evolution Fresh

San Bernardino County, California · CAISO · operated by Bloom Energy

Retired 20242023 · headline year

Retired — its last generating unit went out of service in 2024, ending 1.1 MW of capacity, 100% natural gas by fuel energy in 2023.

Fuel spend$272,0402023 · estimate
Retired capacity1.1MW1 unit · none in service
Reported suppliersNot reported2023

Location

San Bernardino County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 32,679 MMBtu · reported · $272,040 est.

Reported fuel consumption, MMBtu · 2014–23

020,00040,00060,000201420182023
Reported (through 2023)

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit SBK001.1Natural GasOther Natural Gas2014Retired 2024

1 unit shown. Behind it, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Bloom Energy
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
59804

Common questions

How big is Starbucks - Evolution Fresh?
1.1 MW across 1 unit, none of which is in service — all retired.
Who owns and operates it?
Operated by Bloom Energy, filed as commercial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
When is it due to retire?
It has already retired — the last unit retired in 2024.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $272,040 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→Southern Owens Valley Solar RanchPower facility→ Spadra LandfillIndustrial + power facility→ Stockton 1 - slcva801Power facility→ Stockton 6 - SLEBA202Power facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming