Hopkins County, Texas · ERCOT · operated by Stampede Solar Project LLC
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit STMPB | 72.2 | Storage | Batteries | 2024 | Operating |
| Unit STMPS | 255.9 | Solar | Solar Photovoltaic | 2025 | Proposed |
All 2 units shown. Behind each one, AEA holds the full engineering record: energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit STMPS | new unit | 2025 | 256 MW |