New Carlisle, ST. Joseph County, Indiana · PJM · operated by St Joseph Energy Center LLC · owned by Ares Management Corp and Toyota Tsusho America Inc
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit CT1 | 260.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2018 | Operating |
| Unit CT2 | 260.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2018 | Operating |
| Unit ST1 | 260.0 | Natural Gas | Natural Gas Fired Combined Cycle | 2018 | Operating |
| Unit 1 | 670.0 | Natural Gas | Natural Gas Fired Combined Cycle | not reported | Canceled |
| Unit ST2 | 260.0 | Natural Gas | Natural Gas Fired Combined Cycle | not reported | Canceled |
| Unit CT3 | 238.0 | Natural Gas | Natural Gas Fired Combined Cycle | not reported | Canceled |
| Unit CT4 | 238.0 | Natural Gas | Natural Gas Fired Combined Cycle | not reported | Canceled |
All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
See the engineering record →| Supplier | Fuel | Delivered TBtu | Tons | Mine of origin | Transport |
|---|---|---|---|---|---|
| DTE Energy | Natural gas | 34.8 | n/a | n/a | Pipeline |
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 68 deliveries recorded 2018–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
See the delivery history →