St. Johns River Power

Jacksonville, Duval County, Florida · JEA · operated by JEA

last reported to the EPA in 2017

Retired 2018

Retired — its last generating unit went out of service in 2018, ending 1,358 MW of capacity.

Retired capacity1,358MW2 units · none in service
CO₂ emittedNot reported2023 · last reported 2017
Reported suppliersNot reported2023 · last deliveries 2017

Location

Duval County · JEA · SERC

CO₂ emitted, Mt · 2011–17

02.557.5201120142017
Reported (through 2017)

Generating units

2 of 2 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1679.0Bituminous coalConventional Steam Coal1987Retired 2018
Unit 2679.0Bituminous coalConventional Steam Coal1988Retired 2018

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 275 deliveries are on record for 2011–2017.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
JEA
Jointly held units
Florida Power & Light Co 20% of 1 unit
JEA 80% of 1 unit
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1006587
Balancing authority
JEA
NERC region
SERC
EIA plant ID
207

Common questions

How big is St. Johns River Power?
1,358 MW across 2 units, none of which is in service — all retired.
Who owns and operates it?
Operated by JEA, filed as municipally owned utility. 2 owner stakes are filed on jointly held units.
Which grid does it sell into?
JEA is its balancing authority, inside NERC's SERC region.
When is it due to retire?
It has already retired — the last unit retired in 2018.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by bituminous coal.

Related pages

Florida energyAll facilities in the state→St Josephs HospitalPower facility→ St Vincents Medical CenterPower facility→ Standby Generation PlantPower facility→ Sundance Renewable Energy CenterPower facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming