St Francisville Mill

West Feliciana Parish, Louisiana · MISO · operated by Hood Container of Louisiana, LLC

2023 · headline year
Capacity in service12.5MW1 unit · biomass
Net generation116GWh2023 · reported
Rank in Louisiana#69of 86 · by capacity · #5,117 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

West Feliciana Parish · MISO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

56% Black liquor · 3.57 TBtu · reported44% Natural gas · 2.75 TBtu · reported

Black liquor supplies 56% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2013–2023

0369201320182023
Reported (through 2023)

Generating units

2 of 2 shown · 12.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN212.5Black liquorWood/Wood Waste Biomass1966Operating
Unit GEN145.0Natural GasNatural Gas Fired Combustion Turbine1985Retired 1999

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Hood Container of Louisiana, LLC
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
MISO
NERC region
SERC
Gas pipeline
American Midstream Midla LLC, Texas Eastern Transmission LP
EIA plant ID
10697

Common questions

How big is St Francisville Mill?
12.5 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Hood Container of Louisiana, LLC, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1966.
When is it due to retire?
No retirement date has been filed for any operating unit at St Francisville Mill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned black liquor and natural gas.

Related pages

Louisiana energyAll facilities in the state→New Orleans Solar Station20.0 MW operating capacity→ St. James Solar (LA)20.0 MW operating capacity→ Agrilectric Power Partners Ltd12.1 MW operating capacity→ New Roads9.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming