Retired — its last generating unit went out of service in 2019, ending 3.2 MW of capacity.
Retired capacity3.2MW2 units · none in service
Reported suppliersNot reported2023
Location
Reported fuel consumption, MMBtu · 2012–19
Reported (through 2019)
Generating units
2 of 2 shown · none in service
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →
Who supplies the fuel
2023
No fuel deliveries are reported for 2023.
Ownership & operations
- Operating utility
- Innovative Energy Systems Inc
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- NYISO
- NERC region
- NPCC
- EIA plant ID
- 58295
Common questions
How big is SREC Bath LFGTE?
3.2 MW across 2 units, none of which is in service — all retired.
Who owns and operates it?
Operated by Innovative Energy Systems Inc, filed as independent power producer.
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
When is it due to retire?
It has already retired — the last unit retired in 2019.
What does it burn, and where does the fuel come from?
Its generating units are fuelled by landfill gas.
Related pages
Select a state