AMERICAN ENERGY ATLAS
Power·California

SPI Anderson 2

Shasta County, California · CAISO · operated by Sierra Pacific Industries

2023 · headline year
Fuel spend$77,5632023 · estimate
Capacity in service30.2MW1 unit · biomass
Net generation142GWh2023 · reported
Rank in California#504 (tied)of 1,713 · by capacity · #4,006 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor54%2023

Location

Shasta County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 2.97 TBtu · reported

Reported fuel consumption, TBtu · 2015–23

0246201520192023
Reported (through 2023)

Generating units

1 of 1 shown · 30.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN130.2WoodWood/Wood Waste Biomass2015Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Sierra Pacific Industries
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
59658

Common questions

How big is SPI Anderson 2?
30.2 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Sierra Pacific Industries, filed as commercial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2015.
When is it due to retire?
No retirement date has been filed for any operating unit at SPI Anderson 2. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.
How much does it spend on fuel?
An estimated $77,563 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→Ols Energy Chino30.8 MW operating capacity→ P66 Rodeo Solar30.2 MW operating capacity→ Torrance Refining Company LLC30.0 MW operating capacity→ Big Creek 830.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming