Fuel spend$77,5632023 · estimate
Capacity in service30.2MW1 unit · biomass
Net generation142GWh2023 · reported
Rank in California#504 (tied)of 1,713 · by capacity · #4,006 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor54%2023
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is SPI Anderson 2?
30.2 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Sierra Pacific Industries, filed as commercial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2015.
When is it due to retire?
No retirement date has been filed for any operating unit at SPI Anderson 2. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.
How much does it spend on fuel?
An estimated $77,563 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.