Southside Water Reclamation Plant

Bernalillo County, New Mexico · PNM · operated by Albuquerque City of

2023 · headline year
Fuel spend$197,8302023 · estimate
Capacity in service6.6MW4 units · gas + biomass
Net generation20GWh2023 · reported
Rank in New Mexico#100of 153 · by capacity · #6,214 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor35%2023

Location

Bernalillo County · PNM · WECC

What it burns

2023 · reported

Share of reported fuel consumption

65% Landfill gas · 138,066 MMBtu · reported35% Natural gas · 75,552 MMBtu · reported · $197,830 est.

Landfill gas supplies 65% of the fuel energy it burned in 2023.

Reported fuel consumption, MMBtu · 2011–2023

0300,000600,000900,000201120172023
Reported (through 2023)

Generating units

4 of 4 shown · 6.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN12.2Natural GasNatural Gas Internal Combustion Engine2002Operating
Unit GEN22.2BiogasOther Waste Biomass2002Operating
Unit GEN31.1BiogasOther Waste Biomass1987Operating
Unit GEN41.1Natural GasNatural Gas Internal Combustion Engine1987Operating

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Albuquerque City of
Entity type
Political Subdivision
Regulatory status
Not Regulated
Balancing authority
PNM
NERC region
WECC
Gas pipeline
New Mexico Gas Company
EIA plant ID
10339

Common questions

How big is Southside Water Reclamation Plant?
6.6 MW across 4 generating units in service — 3.3 MW of natural gas and 3.3 MW of biomass.
Who owns and operates it?
Operated by Albuquerque City of, filed as political subdivision.
Which grid does it sell into?
PNM (Public Service Company of New Mexico) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1997. The oldest operating units are Unit GEN3 and Unit GEN4 (1987); the newest are Unit GEN1 and Unit GEN2 (2002).
When is it due to retire?
No retirement date has been filed for any operating unit at Southside Water Reclamation Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas and natural gas.
How much does it spend on fuel?
An estimated $197,830 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

New Mexico energyAll facilities in the state→Cibola7.6 MW operating capacity→ Los Lunas Solar Energy Center7.0 MW operating capacity→ Sandoval Solar Energy Center6.1 MW operating capacity→ Alamogordo Solar Energy Center5.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming