AMERICAN ENERGY ATLAS
Industrial + power·Michigan

Southeast Berrien County Landfill

Buchanan, Berrien County, Michigan · PJM · operated by North American Natural Res · owned by Southeast Berrien County Landfill

2023 · headline year
Capacity in service4.8MW1 unit · biomass
Net generation31.6GWh2023 · reported
CO₂ emitted153,061t2023 · reported to EPA · 1,817th highest of 6,030 in the US
Rank in Michigan#179 (tied)of 258 · by capacity · #7,658 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor75%2023

Location

Berrien County · PJM · RFC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 373,408 MMBtu · reported

CO₂ emitted, t · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 4.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit SBL4.8Landfill gasLandfill Gas2009Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Southeast Berrien County Landfill · 100%
Operating utility
North American Natural Res
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Waste
EPA facility ID
1004025
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
59574

Common questions

How big is Southeast Berrien County Landfill?
4.8 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Southeast Berrien County Landfill (100%) and operated by North American Natural Res, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2009.
When is it due to retire?
No retirement date has been filed for any operating unit at Southeast Berrien County Landfill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned landfill gas.
How much CO₂ does it emit?
153,061 t in 2023, reported to the EPA — the 1,817th highest of 6,030 US facilities that reported. Up from 67,154 t in 2011.

Related pages

Michigan energyAll facilities in the state→Byrne Solar, LLC5.0 MW operating capacity→ Mio5.0 MW operating capacity→ Bryon Center4.8 MW operating capacity→ Central Michigan University4.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming