AMERICAN ENERGY ATLAS
Power·Delaware

South Campus Solar

New Castle County, Delaware · PJM · operated by JPMorgan Chase Bank

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service1.8MW2 units · solar
Rank in Delaware#25of 33 · by capacity · #10,832 (tied) of 13,147 US

Location

New Castle County · PJM · RFC

Generating units

4 of 4 shown · 1.8 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit G17891.3SolarSolar Photovoltaic2021Operating
Unit GA5000.5SolarSolar Photovoltaic2011Operating
Unit SG5000.5SolarSolar Photovoltaic2011Retired 2018
Unit SG3330.3SolarSolar Photovoltaic2011Retired 2018

All 4 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity.

See the engineering record →

Ownership & operations

Operating utility
JPMorgan Chase Bank
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
EIA plant ID
59922

Common questions

How big is South Campus Solar?
1.8 MW across 2 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by JPMorgan Chase Bank, filed as commercial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2018. The oldest operating unit is Unit GA500 (2011); the newest is Unit G1789 (2021).
When is it due to retire?
No retirement date has been filed for any operating unit at South Campus Solar. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (1.8 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Delaware energyAll facilities in the state→Brookside Newark2.6 MW operating capacity→ University of Delaware Wind Turbine2.0 MW operating capacity→ Blue Hen Solar1.5 MW operating capacity→ WHA Southbridge Solar Park CSG1.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming