AMERICAN ENERGY ATLAS
Power·South Carolina

Sonoco Products Co

Darlington County, South Carolina · CPLE · operated by Sonoco Products Co

2023 · headline year
Capacity in service38.0MW2 units · biomass · 1 more on standby or out of service
Net generation57.7GWh2023 · reported
Rank in South Carolina#57of 204 · by capacity · #3,834 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Darlington County · CPLE · SERC

What it burns

2023 · reported

Share of reported fuel consumption

83% Biomass · 2.46 TBtu · reported17% Natural gas · 0.522 TBtu · reported

Biomass supplies 83% of the fuel energy it burned in 2023.

Reported fuel consumption, TBtu · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 38.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 428.0WoodWood/Wood Waste Biomass1957Operating
Unit 310.0WoodWood/Wood Waste Biomass1947Operating
Unit 22.5Natural GasNatural Gas Steam Turbine1950Standby

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Sonoco Products Co
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
CPLE
NERC region
SERC
EIA plant ID
57919

Common questions

How big is Sonoco Products Co?
38.0 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Sonoco Products Co, filed as industrial.
Which grid does it sell into?
CPLE (Duke Energy Progress East) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1954. The oldest operating unit is Unit 3 (1947); the newest is Unit 4 (1957).
When is it due to retire?
No retirement date has been filed for any operating unit at Sonoco Products Co. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass and natural gas.

Also at this site

Sonoco Products Co.Same site→

Related pages

South Carolina energyAll facilities in the state→Coit GT39.2 MW operating capacity→ Peony Solar39.0 MW operating capacity→ Allendale Biomass22.5 MW operating capacity→ Dorchester Biomass22.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming