AMERICAN ENERGY ATLAS
Power·Minnesota

Solway Plant

Solway, Beltrami County, Minnesota · MISO · operated by Otter Tail Power Co · owned by Otter Tail Corp

2023 · headline year
Fuel spend$8.11M2023 · estimate
Capacity in service50.0MW1 unit · gas · 1 more on standby or out of service
Net generation163GWh2023 · reported
CO₂ emitted88,210t2023 · reported to EPA · 2,608th highest of 6,030 in the US
Rank in Minnesota#61 (tied)of 767 · by capacity · #3,450 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011

Location

Beltrami County · MISO · MRO

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 1.64 TBtu · reported · $8.1M est.

CO₂ emitted, t · 2011–2023

030,00060,00090,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 50.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 150.0Natural GasNatural Gas Fired Combustion Turbine2003Operating
Unit D11.3Distillate oilPetroleum Liquids2005Standby

All 2 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 24 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Otter Tail Corp · 100%
Operating utility
Otter Tail Power Co
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000118
Balancing authority
MISO
NERC region
MRO
Gas pipeline
Great Lakes Gas Transmission LP
EIA plant ID
7947

Common questions

How big is Solway Plant?
50.0 MW across 1 generating unit in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Otter Tail Corp (100%) and operated by Otter Tail Power Co, filed as investor-owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2003.
When is it due to retire?
No retirement date has been filed for any operating unit at Solway Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $8.11M in 2023 — natural gas $8.1M and oil & petroleum $13,856. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
88,210 t in 2023, reported to the EPA — the 2,608th highest of 6,030 US facilities that reported. Up from 19,310 t in 2011.

Also at this site

Solway SolarSame site · planned→

Related pages

Minnesota energyAll facilities in the state→Lakeswind Power Partners51.8 MW operating capacity→ Moraine Wind LLC51.0 MW operating capacity→ Jeffers Wind 20 LLC50.0 MW operating capacity→ Louise Solar50.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming