AMERICAN ENERGY ATLAS
Power·Alaska

Soldotna Combustion Turbine Plant

Soldotna, Kenai Peninsula Borough, Alaska · operated by Homer Electric Assn Inc · owned by Homer Electric Assoc Inc

2023 · headline year
Fuel spend$1.61M2023 · estimate
Capacity in service96.5MW2 units · gas + storage
CO₂ emitted12,003t2023 · reported to EPA · 5,710th highest of 6,030 in the US
Rank in Alaska#6of 142 · by capacity · #2,541 of 13,147 US
Reported suppliersNot reported2023

Location

Kenai Peninsula Borough

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 220,902 MMBtu · reported · $1.61M est.

CO₂ emitted, t · 2014–23

020,00040,00060,000201420182023
Reported (through 2023)

Generating units

3 of 3 shown · 96.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 150.0Natural GasNatural Gas Fired Combustion Turbine2014Operating
Unit 346.5StorageBatteries2022Operating
Unit 250.0Natural GasNatural Gas Fired Combustion Turbinenot reportedCanceled

All 3 units shown. Behind each one, AEA holds the full engineering record: energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Homer Electric Assoc Inc · 100%
Operating utility
Homer Electric Assn Inc
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1011532
EIA plant ID
57206

Common questions

How big is Soldotna Combustion Turbine Plant?
96.5 MW across 2 generating units in service — 50.0 MW of natural gas and 46.5 MW of storage. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Homer Electric Assoc Inc (100%) and operated by Homer Electric Assn Inc, filed as cooperative.
How old is it?
The capacity-weighted average megawatt here came online in 2018. The oldest operating unit is Unit 1 (2014); the newest is Unit 3 (2022).
When is it due to retire?
No retirement date has been filed for any operating unit at Soldotna Combustion Turbine Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.61M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
12,003 t in 2023, reported to the EPA — the 5,710th highest of 6,030 US facilities that reported. Down from 27,364 t in 2014.

Related pages

Alaska energyAll facilities in the state→Eklutna Generation Station171 MW operating capacity→ Bradley Lake126 MW operating capacity→ Golden Valley Electric Association Inc - Healy Power Plant92.8 MW operating capacity→ Nikiski Co-Generation80.8 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming