San Bernardino County, California · CAISO · operated by Southern California Edison Co
Retired — its last generating unit went out of service in 2023, ending 3.5 MW of capacity.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit S028A | 0.5 | Solar | Solar Photovoltaic | 2015 | Retired 2023 |
| Unit S028B | 0.5 | Solar | Solar Photovoltaic | 2015 | Retired 2023 |
| Unit S028C | 0.5 | Solar | Solar Photovoltaic | 2015 | Retired 2023 |
| Unit S028D | 0.5 | Solar | Solar Photovoltaic | 2015 | Retired 2023 |
| Unit S028E | 0.5 | Solar | Solar Photovoltaic | 2015 | Retired 2023 |
| Unit S028F | 0.5 | Solar | Solar Photovoltaic | 2015 | Retired 2023 |
| Unit S028G | 0.5 | Solar | Solar Photovoltaic | 2015 | Retired 2023 |
| Unit S028H | 0.5 | Solar | Solar Photovoltaic | not reported | Canceled |
All 8 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →