AMERICAN ENERGY ATLAS
Power·Arizona

Solana Generating Station

Maricopa County, Arizona · AZPS · operated by Arizona Solar One LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service280MW2 units · solar
Rank in Arizona#32of 166 · by capacity · #1,084 (tied) of 13,147 US

Location

Maricopa County · AZPS · WECC

Generating units

2 of 2 shown · 280 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN 1140.0SolarSolar Thermal with Energy Storage2013Operating
Unit GEN2140.0SolarSolar Thermal with Energy Storage2013Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Arizona Solar One LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
AZPS
NERC region
WECC
EIA plant ID
56812

Common questions

How big is Solana Generating Station?
280 MW across 2 generating units in service.
Who owns and operates it?
Operated by Arizona Solar One LLC, filed as independent power producer.
Which grid does it sell into?
AZPS (Arizona Public Service Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2013. Every operating unit came online in 2013.
When is it due to retire?
No retirement date has been filed for any operating unit at Solana Generating Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Thermal with Energy Storage (280 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (solar thermal with energy storage) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Arizona energyAll facilities in the state→Agua Caliente Solar Project348 MW operating capacity→ McFarland A Solar and Storage300 MW operating capacity→ Davis Dam255 MW operating capacity→ Sierra Estrella Energy Storage250 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming