AMERICAN ENERGY ATLAS
Power·Texas

Sim Gideon

Bastrop, Bastrop County, Texas · ERCOT · operated by Lower Colorado River Authority · owned by Lower Colorado River Authority

2023 · headline year
Reported fuel cost$28.5M2023 · reported deliveries
Capacity in service623MW3 units · gas
Net generation1.2TWh2023 · reported
CO₂ emitted703,223t2023 · reported to EPA · 781st highest of 6,030 in the US
Rank in Texas#64of 941 · by capacity · #551 (tied) of 13,147 US
Reported suppliers52023 · 312 deliveries
Capacity factor22%2023

Location

Bastrop County · ERCOT · TRE

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 13.5 TBtu · reported

CO₂ emitted, t · 2011–2023

0250,000500,000750,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 623 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 3351.0Natural GasNatural Gas Steam Turbine1972Operating
Unit 1136.0Natural GasNatural Gas Steam Turbine1965Operating
Unit 2136.0Natural GasNatural Gas Steam Turbine1968Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 5 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
DCPNatural gas8.38n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 5 suppliers. Subscribe to see all 5, every one of the 1,173 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 5 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Lower Colorado River Authority · 100%
Operating utility
Lower Colorado River Authority
Entity type
Political Subdivision
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000954
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
Gas pipeline
Energy Transfer Company Texas PL LTD, Enterprise Texas Pipeline
EIA plant ID
3601

Common questions

How big is Sim Gideon?
623 MW across 3 generating units in service.
Who owns and operates it?
Owned by Lower Colorado River Authority (100%) and operated by Lower Colorado River Authority, filed as political subdivision.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 1970. The oldest operating unit is Unit 1 (1965); the newest is Unit 3 (1972).
When is it due to retire?
No retirement date has been filed for any operating unit at Sim Gideon. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 5 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $28.5M in 2023.
How much CO₂ does it emit?
703,223 t in 2023, reported to the EPA — the 781st highest of 6,030 US facilities that reported. Up from 348,095 t in 2011.

Related pages

Texas energyAll facilities in the state→Graham635 MW operating capacity→ Decordova627 MW operating capacity→ Coleto Creek622 MW operating capacity→ Bastrop Clean Energy Center619 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming