Power·Mississippi

Silver Creek Generating Plant

Prentiss, Jefferson Davis County, Mississippi · MISO · operated by Cooperative Energy · owned by Cooperative Energy A Mississippi Electric Cooperative

2023 · headline year
Reported fuel cost$8.48M2023 · reported deliveries
Capacity in service250MW3 units · gas
Net generation210GWh2023 · reported
CO₂ emitted131,853t2023 · reported to EPA · 2,004th highest of 6,030 in the US
Rank in Mississippi#19of 59 · by capacity · #1,168 of 13,147 US
Reported suppliers132023 · 143 deliveries
Capacity factor10%2023

Location

Jefferson Davis County · MISO · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 2.56 TBtu · reported

CO₂ emitted, t · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 250 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 183.5Natural GasNatural Gas Fired Combustion Turbine2003Operating
Unit 283.5Natural GasNatural Gas Fired Combustion Turbine2004Operating
Unit 383.5Natural GasNatural Gas Fired Combustion Turbine2005Operating

All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

1 of 13 suppliers · delivered in 2023
SupplierFuelDelivered MMBtuTonsMine of originTransport
Tenaska Marketing VenturesNatural gas736,077n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 13 suppliers. Subscribe to see all 13, every one of the 454 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 13 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Cooperative Energy
Entity type
Cooperative
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000190
Balancing authority
MISO
NERC region
SERC
Gas pipeline
Southcross Energy LLC
EIA plant ID
7988

Common questions

How big is Silver Creek Generating Plant?
250 MW across 3 generating units in service.
Who owns and operates it?
Owned by Cooperative Energy A Mississippi Electric Cooperative (100%) and operated by Cooperative Energy, filed as cooperative.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2004. The oldest operating unit is Unit 1 (2003); the newest is Unit 3 (2005).
When is it due to retire?
No retirement date has been filed for any operating unit at Silver Creek Generating Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 13 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $8.48M in 2023.
How much CO₂ does it emit?
131,853 t in 2023, reported to the EPA — the 2,004th highest of 6,030 US facilities that reported. Up from 105,428 t in 2011.

Related pages

Mississippi energyAll facilities in the state→Kemper County372 MW operating capacity→ Crossroads Energy Center (CPU)306 MW operating capacity→ Golden Triangle II200 MW operating capacity→ Delta Wind Farm (MS)184 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming