AMERICAN ENERGY ATLAS
Industrial + power·California

Signal Hill Petroleum West Unit

Signal Hill, Los Angeles County, California · CAISO · operated by Signal Hill Petroleum, Inc · owned by Signal Hill Petroleum Inc

last reported to the EPA in 2015

2023 · headline year
Capacity in service5.7MW1 unit · gas
Net generation35.2GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2015
Rank in California#856 (tied)of 1,713 · by capacity · #6,439 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor70%2023

Location

Los Angeles County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Refinery gas · 595,267 MMBtu · reported

CO₂ emitted, t · 2011–15

020,00040,00060,000201120132015
Reported (through 2015)

Generating units

1 of 1 shown · 5.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 15.7Other gasOther Gases2004Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Signal Hill Petroleum Inc · 100%
Operating utility
Signal Hill Petroleum, Inc
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Petroleum and Natural Gas Systems
EPA facility ID
1004651
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
57702

Common questions

How big is Signal Hill Petroleum West Unit?
5.7 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Signal Hill Petroleum Inc (100%) and operated by Signal Hill Petroleum, Inc, filed as industrial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2004.
When is it due to retire?
No retirement date has been filed for any operating unit at Signal Hill Petroleum West Unit. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned refinery gas.

Related pages

California energyAll facilities in the state→Community Solar 15.7 MW operating capacity→ Drop 15.7 MW operating capacity→ Foundation Dole Fresh Vegetables5.6 MW operating capacity→ Big Bear5.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming