Wichita Falls, Wichita County, Texas · ERCOT · operated by Signal Hill Generating LLC
last reported to the EPA in 2014
2023 · headline year
Capacity in service60.0MW3 units · gas · 1 more on standby or out of service
Net generation7.1GWh2023 · reported
CO₂ emittedNot reported2023 · last reported 2014
Rank in Texas#509of 941 · by capacity · #3,236 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 109,274 MMBtu · reported
CO₂ emitted, t · 2011–14
Reported (through 2014)
Generating units
4 of 4 shown · 60.0 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GTA
20.0
Natural Gas
Natural Gas Fired Combined Cycle
1987
Operating
Unit GTB
20.0
Natural Gas
Natural Gas Fired Combined Cycle
1987
Operating
Unit GTC
20.0
Natural Gas
Natural Gas Fired Combined Cycle
1987
Operating
Unit STD
20.0
Natural Gas
Natural Gas Fired Combined Cycle
1987
Out of service
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
60.0 MW across 3 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Signal Hill Generating LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 1987. Every operating unit came online in 1987.
When is it due to retire?
No retirement date has been filed for any operating unit at Signal Hill Generating LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?