AMERICAN ENERGY ATLAS
Power·California

Sierra Pacific Quincy Facility

Plumas County, California · CAISO · operated by Sierra Pacific Industries

2023 · headline year
Capacity in service35.2MW1 unit · biomass
Net generation171GWh2023 · reported
Rank in California#483of 1,713 · by capacity · #3,897 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor56%2023

Location

Plumas County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 4.26 TBtu · reported

Reported fuel consumption, TBtu · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 35.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN335.2WoodWood/Wood Waste Biomass2018Operating
Unit GEN120.0WoodWood/Wood Waste Biomass1986Retired 2018
Unit GEN27.5WoodWood/Wood Waste Biomass1999Retired 2018

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Sierra Pacific Industries
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
50112

Common questions

How big is Sierra Pacific Quincy Facility?
35.2 MW across 1 generating unit in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Sierra Pacific Industries, filed as commercial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2018.
When is it due to retire?
No retirement date has been filed for any operating unit at Sierra Pacific Quincy Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.

Related pages

California energyAll facilities in the state→Brea Expansion Plant35.7 MW operating capacity→ University of California San Diego35.5 MW operating capacity→ Paulsell35.0 MW operating capacity→ Oak Creek Energy Systems I34.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming