Sierra Pacific Lincoln Facility

Placer County, California · CAISO · operated by Sierra Pacific Industries

2023 · headline year
Capacity in service19.2MW1 unit · biomass
Net generation87.9GWh2023 · reported
Rank in California#661 (tied)of 1,713 · by capacity · #4,698 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor52%2023

Location

Placer County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 2.26 TBtu · reported

Reported fuel consumption, TBtu · 2011–2023

0123201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 19.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN419.2WoodWood/Wood Waste Biomass2004Operating
Unit GEN211.5WoodWood/Wood Waste Biomass1997Retired 2004
Unit GEN31.5WoodWood/Wood Waste Biomass1999Retired 2004

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Sierra Pacific Industries
Entity type
Commercial
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
10144

Common questions

How big is Sierra Pacific Lincoln Facility?
19.2 MW across 1 generating unit in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Sierra Pacific Industries, filed as commercial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2004.
When is it due to retire?
No retirement date has been filed for any operating unit at Sierra Pacific Lincoln Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.

Related pages

California energyAll facilities in the state→Kelco19.2 MW operating capacity→ Columbia Solar Energy, LLC19.2 MW operating capacity→ University of California, Irvine19.0 MW operating capacity→ RE Adams East, LLC19.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming