Fuel spend$1.32M2023 · estimate
Capacity in service4.2MW3 units · gas + solar + storage
Rank in California#970 (tied)of 1,713 · by capacity · #7,980 (tied) of 13,147 US
Reported suppliersNot reported2023
All 4 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times; panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.
See the engineering record →
How big is Sierra Nevada Brewing Co Hybrid?
4.2 MW across 3 generating units in service — 2.0 MW of natural gas, 1.7 MW of solar and 0.5 MW of storage. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Sierra Nevada Brewing Co, filed as industrial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2012. The oldest operating unit is Unit SOLR (2007); the newest is Unit BESS (2017).
When is it due to retire?
No retirement date has been filed for any operating unit at Sierra Nevada Brewing Co Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.32M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.