Power·California
Sienna 2 Solar and Storage Project
San Bernardino County, California · CAISO · operated by 44ST 8ME LLC
Capacity shown is planned or not in service
Proposed
A planned 110 MW solar photovoltaic project, filed to come online in 2029.
Planned capacity110MW2 units · not yet in service
Location
Generating units
2 of 2 shown · none in service
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- 44ST 8ME LLC
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- CAISO
- NERC region
- WECC
- EIA plant ID
- 68486
Common questions
How big is Sienna 2 Solar and Storage Project?
110 MW across 2 units, none of which is in service — all planned.
Who owns and operates it?
Operated by 44ST 8ME LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
What does it run on?
Solar Photovoltaic (55.0 MW) and Batteries (55.0 MW).
Related pages
Select a state