AMERICAN ENERGY ATLAS
Power·Virginia

Shenvalee Solar

Augusta County, Virginia · PJM · operated by Antares Group Inc

Capacity shown is planned or not in service

Proposed

A planned 3.0 MW solar photovoltaic project, filed to come online in 2027.

Planned capacity3.0MW1 unit · not yet in service

Location

Augusta County · PJM · SERC

Generating units

1 of 1 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit SV3.0SolarSolar Photovoltaic2027Proposed

1 unit shown. Behind it, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →
UnitEventWhenMW
Unit SVnew unit20273.0 MW

Ownership & operations

Operating utility
Antares Group Inc
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
PJM
NERC region
SERC
EIA plant ID
65312

Common questions

How big is Shenvalee Solar?
3.0 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Antares Group Inc, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
What does it run on?
Solar Photovoltaic (3.0 MW).

Related pages

Virginia energyAll facilities in the state→Scott WoodPower facility→ Sebera SolarPower facility→ Shifting Sands Solar, LLCPower facility→ Shoosmith Sanitary LandfillIndustrial facility→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming