AMERICAN ENERGY ATLAS
Power·Kentucky

Shawnee

West Paducah, McCracken County, Kentucky · TVA · operated by Tennessee Valley Authority · owned by US Government

2023 · headline year
Reported fuel cost$123M2023 · reported deliveries
Capacity in service1,575MW9 units · coal
Net generation4.72TWh2023 · reported
CO₂ emitted5.83Mt2023 · reported to EPA · 52nd highest of 6,030 in the US
Rank in Kentucky#5of 58 · by capacity · #140 of 13,147 US
Reported suppliers52023 · 61 deliveries
Capacity factor34%2023

Location

McCracken County · TVA · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Coal · 55.9 TBtu · reported

CO₂ emitted, Mt · 2011–2023

0369201120172023
Reported (through 2023)

Generating units

10 of 10 shown · 1,575 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 1175.0SubbituminousConventional Steam Coal1953Operating
Unit 2175.0SubbituminousConventional Steam Coal1953Operating
Unit 3175.0SubbituminousConventional Steam Coal1953Operating
Unit 4175.0SubbituminousConventional Steam Coal1954Operating
Unit 5175.0SubbituminousConventional Steam Coal1954Operating
Unit 6175.0SubbituminousConventional Steam Coal1954Operating
Unit 7175.0SubbituminousConventional Steam Coal1954Operating
Unit 8175.0SubbituminousConventional Steam Coal1955Operating
Unit 9175.0SubbituminousConventional Steam Coal1955Operating
Unit 10175.0Bituminous coalConventional Steam Coal1956Retired 2014

All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →
UnitEventWhenMW
Unit 1retirement2033-12175 MW
Unit 2retirement2033-12175 MW
Unit 4retirement2033-12175 MW
Unit 5retirement2033-12175 MW
Unit 6retirement2033-12175 MW
Unit 7retirement2033-12175 MW
Unit 8retirement2033-12175 MW
Unit 9retirement2033-12175 MW

Who supplies the fuel

1 of 5 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Navajo Transitional Energy Co., LLCCoal47.12,640,160Antelope Coal Mine, WyomingRail

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.

Showing 1 of 5 suppliers. Subscribe to see all 5, every one of the 916 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 5 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
US Government
Operating utility
Tennessee Valley Authority
Entity type
Federally Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1001598
Balancing authority
TVA
NERC region
SERC
EIA plant ID
1379

Common questions

How big is Shawnee?
1,575 MW across 9 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by US Government and operated by Tennessee Valley Authority, filed as federally owned utility.
Which grid does it sell into?
TVA (Tennessee Valley Authority) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1954. The oldest operating units are Unit 1, Unit 2 and Unit 3 (1953); the newest are Unit 8 and Unit 9 (1955).
When is it due to retire?
Planned retirement dates are filed for 8 of 9 operating units: Unit 1 (2033), Unit 2 (2033), Unit 4 (2033), Unit 5 (2033), Unit 6 (2033), Unit 7 (2033), Unit 8 (2033) and Unit 9 (2033).
What does it burn, and where does the fuel come from?
In 2023 it burned coal. Coal delivered in 2023 came from 4 coal suppliers, from mines in Wyoming and Utah — principally Antelope Coal Mine. Other fuels (oil & petroleum) came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $123M in 2023.
How much CO₂ does it emit?
5.83 Mt in 2023, reported to the EPA — the 52nd highest of 6,030 US facilities that reported. Down from 7.98 Mt in 2011.

Related pages

Kentucky energyAll facilities in the state→Paradise1,854 MW operating capacity→ H L Spurlock1,608 MW operating capacity→ E.W. Brown1,458 MW operating capacity→ Mill Creek1,362 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming