Shasta County, California · CAISO · operated by TotalEnergies Distributed Generation, LLC
Capacity shown is planned or not in service
A planned 2.0 MW solar photovoltaic project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit SCSP1 | 1.5 | Solar | Solar Photovoltaic | 2025 | Proposed |
| Unit SCSPB | 0.5 | Storage | Batteries | 2025 | Proposed |
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit SCSP1 | new unit | 2025 | 1.5 MW |
| Unit SCSPB | new unit | 2025 | 0.5 MW |