AMERICAN ENERGY ATLAS
Power·California

Second Imperial Geothermal

Imperial County, California · IID · operated by ORCAL Geothermal, Inc

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service74.5MW4 units · geothermal
Rank in California#305of 1,713 · by capacity · #2,896 (tied) of 13,147 US

Location

Imperial County · IID · WECC

Generating units

16 of 16 shown · 74.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit OEC126.5GeothermalGeothermal2022Operating
Unit GE1316.0GeothermalGeothermal2006Operating
Unit GEN1416.0GeothermalGeothermal2008Operating
Unit OEC216.0GeothermalGeothermal2022Operating
Unit GE104.5GeothermalGeothermal1993Retired 2022
Unit GE114.5GeothermalGeothermal1993Retired 2022
Unit GE124.5GeothermalGeothermal1993Retired 2022
Unit GEN74.5GeothermalGeothermal1993Retired 2022
Unit GEN84.5GeothermalGeothermal1993Retired 2022
Unit GEN94.5GeothermalGeothermal1993Retired 2022
Unit GEN13.5GeothermalGeothermal1993Retired 2022
Unit GEN23.5GeothermalGeothermal1993Retired 2022
Unit GEN33.5GeothermalGeothermal1993Retired 2022
Unit GEN43.5GeothermalGeothermal1993Retired 2022
Unit GEN53.5GeothermalGeothermal1993Retired 2022
Unit GEN63.5GeothermalGeothermal1993Retired 2022

All 16 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Ownership & operations

Operating utility
ORCAL Geothermal, Inc
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
IID
NERC region
WECC
EIA plant ID
54111

Common questions

How big is Second Imperial Geothermal?
74.5 MW across 4 generating units in service. A further 12 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by ORCAL Geothermal, Inc, filed as independent power producer.
Which grid does it sell into?
IID (Imperial Irrigation District) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2016. The oldest operating unit is Unit GE13 (2006); the newest are Unit OEC1 and Unit OEC2 (2022).
When is it due to retire?
No retirement date has been filed for any operating unit at Second Imperial Geothermal. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Geothermal (74.5 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (geothermal) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

California energyAll facilities in the state→RE Astoria 275.0 MW operating capacity→ Colgreen North Shore Solar Farm74.8 MW operating capacity→ W E Warne74.2 MW operating capacity→ Loon Lake74.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming