Riverside County, California · CAISO · operated by SE Athos II, LLC
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit IPAT2 | 200.0 | Solar | Solar Photovoltaic | 2021 | Operating |
| Unit ATHB2 | 200.0 | Storage | Other Energy Storage | 2026 | Planned |
| Unit ATH1S | 102.3 | Storage | Other Energy Storage | 2026 | Planned |
| Unit ATH1N | 100.0 | Storage | Other Energy Storage | 2026 | Planned |
| Unit SEAT2 | 200.0 | Solar | Solar Photovoltaic | not reported | Canceled |
All 5 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit ATH1N | new unit | 2026 | 100 MW |
| Unit ATH1S | new unit | 2026 | 102 MW |
| Unit ATHB2 | new unit | 2026 | 200 MW |