Fuel spend$5,7202023 · estimate
Capacity in service7.2MW2 units · biomass
Net generation7.13GWh2023 · reported
Rank in Ohio#104 (tied)of 189 · by capacity · #6,110 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor11%2023
How big is Sauder Power Plant?
7.2 MW across 2 generating units in service.
Who owns and operates it?
Operated by Sauder Woodworking Co, filed as industrial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1993. Every operating unit came online in 1993.
When is it due to retire?
No retirement date has been filed for any operating unit at Sauder Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass and natural gas.
How much does it spend on fuel?
An estimated $5,720 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.