Cloquet, Carlton County, Minnesota · MISO · operated by Sappi Cloquet LLC · owned by Sappi North America Inc
2023 · headline year
Capacity in service94.5MW7 units · biomass + hydro
CO₂ emitted189,603t2023 · reported to EPA · 1,578th highest of 6,030 in the US
Rank in Minnesota#49of 767 · by capacity · #2,563 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
87% Black liquor · 11.9 TBtu · reported13% Natural gas · 1.74 TBtu · reported
Black liquor supplies 87% of the fuel energy its on-site power plant burned in 2023.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
8 of 8 shown · 94.5 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN4
41.5
Wood
Wood/Wood Waste Biomass
1997
Operating
Unit GEN5
27.6
Black liquor
Wood/Wood Waste Biomass
2001
Operating
Unit GEN3
19.2
Wood
Wood/Wood Waste Biomass
1976
Operating
Unit HGN7
2.8
Water
Conventional Hydroelectric
1980
Operating
Unit HGN1
1.8
Water
Conventional Hydroelectric
1950
Operating
Unit HGN5
0.8
Water
Conventional Hydroelectric
1929
Operating
Unit HGN6
0.8
Water
Conventional Hydroelectric
1929
Operating
Unit GEN1
2.0
Black liquor
Wood/Wood Waste Biomass
1925
Retired 1988
All 8 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
94.5 MW across 7 generating units in service — 88.3 MW of biomass and 6.2 MW of hydro. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Sappi North America Inc (100%) and operated by Sappi Cloquet LLC, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1991. The oldest operating units are Unit HGN5 and Unit HGN6 (1929); the newest is Unit GEN5 (2001).
When is it due to retire?
No retirement date has been filed for any operating unit at Sappi Cloquet LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned black liquor and natural gas.
How much CO₂ does it emit?
189,603 t in 2023, reported to the EPA — the 1,578th highest of 6,030 US facilities that reported. Up from 142,044 t in 2011.