AMERICAN ENERGY ATLAS
Power·California

Santa Rita Jail Hybrid

Alameda County, California · CAISO · operated by County of Alameda GSA

2023 · headline year
Fuel spend$636,6252023 · estimate
Capacity in service2.9MW3 units · solar + gas
Rank in California#1,118 (tied)of 1,713 · by capacity · #9,118 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Alameda County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 76,475 MMBtu · reported · $636,625 est.

Reported fuel consumption, MMBtu · 2017–23

030,00060,00090,000201720202023
Reported (through 2023)

Generating units

6 of 6 shown · 2.9 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit SRFC21.4Natural GasOther Natural Gas2017Operating
Unit SRPV21.0SolarSolar Photovoltaic2016Operating
Unit SRPV30.5SolarSolar Photovoltaic2017Operating
Unit SRJBA2.0StorageBatteries2012Retired 2023
Unit SRJFC1.0Natural GasOther Natural Gas2006Retired 2013
Unit SRJPV0.8SolarSolar Photovoltaic2001Retired 2014

All 6 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
County of Alameda GSA
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
Gas pipeline
Pacific Gas
EIA plant ID
58625

Common questions

How big is Santa Rita Jail Hybrid?
2.9 MW across 3 generating units in service — 1.5 MW of solar and 1.4 MW of natural gas. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by County of Alameda GSA, filed as industrial.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2017. The oldest operating unit is Unit SRPV2 (2016); the newest are Unit SRFC2 and Unit SRPV3 (2017).
When is it due to retire?
No retirement date has been filed for any operating unit at Santa Rita Jail Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $636,625 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→National Raisin2.9 MW operating capacity→ San Diego - EMDF at San Diego2.9 MW operating capacity→ SMUD at Fleshman2.9 MW operating capacity→ SMUD at Van Conett2.9 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming