AMERICAN ENERGY ATLAS
Power·California

Santa Cruz Energy

Santa Cruz County, California · CAISO · operated by Santa Cruz Energy LLC

2023 · headline year
Capacity in service1.6MW1 unit · biomass
Net generation9.97GWh2023 · reported
Rank in California#1,330 (tied)of 1,713 · by capacity · #11,073 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor71%2023

Location

Santa Cruz County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 116,431 MMBtu · reported

Reported fuel consumption, MMBtu · 2011–2023

050,000100,000150,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 1.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit UNT11.6Landfill gasLandfill Gas2009Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Santa Cruz Energy LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
57876

Common questions

How big is Santa Cruz Energy?
1.6 MW across 1 generating unit in service.
Who owns and operates it?
Operated by Santa Cruz Energy LLC, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2009.
When is it due to retire?
No retirement date has been filed for any operating unit at Santa Cruz Energy. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Related pages

California energyAll facilities in the state→POM Plant 21.6 MW operating capacity→ Robert O Schulz Solar Farm1.6 MW operating capacity→ Sonoma Central Landfill Phase III1.6 MW operating capacity→ Sunnyvale City of WPCP1.6 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming